offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›UK: ALE Offloads 7MW Wind Turbine Components
News

January 22, 2014 · about 12 years ago

UK: ALE Offloads 7MW Wind Turbine Components

ALE has completed the off-loading of eight components that will be assembled to create a prototype wind turbine for an offshore wind project in Fife. The 7mw prototype turbine is one of the largest in the worlwd with a nacelle height of 110m and a blade tip height of 196m from sea level. The project

1 minutes read
  • LinkedIn
  • X
  • Email

ALE has completed the off-loading of eight components that will be assembled to create a prototype wind turbine for an offshore wind project in Fife.

The 7mw prototype turbine is one of the largest in the worlwd with a nacelle height of 110m and a blade tip height of 196m from sea level.

The project scope of work was to offload the wind turbine components using the Gottwald AK912-1 and various other assist cranes. Items lifted included: two tower sections weighing 350t each one nacelle weighing 525t, three 85m long blades weighing 80t each, one jacket weighing 480t and one ‘T’ Piece weighing 475t.

The components were lifted from the ship to SPMTs for site transportation to temporary steelwork by the SPMTs inbuilt hydraulic system.

Andy Hunt, Project Engineering Manager at ALE said: “This is a great project to work on, the prototype will be used as a trial prior to the installation of the wind farm in Scotland, the pieces were not out of the ordinary in terms of weight for us however with sections at 85m long some preparatory work was done to ensure the stability and method for transportation.”

Relates:

7MW Offshore Wind Turbine Nearing Completion in Fife, UK

Press release, January 22, 2014; Image:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago