offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›MCT Conducting I/M on SeaGen
News

February 3, 2014 · about 12 years ago

MCT Conducting I/M on SeaGen

Siemens-owned tidal power system specialist Marine Current Turbines (MCT) is conducting an inspection and maintenance work on the SeaGen tidal turbine system. The crossbeam has been raised today and will remain in an upright position for around 28 days. For safety, it is requested that all craft kee

1 minutes read
  • LinkedIn
  • X
  • Email

Siemens-owned tidal power system specialist Marine Current Turbines (MCT) is conducting an inspection and maintenance work on the SeaGen tidal turbine system.

The crossbeam has been raised today and will remain in an upright position for around 28 days.

For safety, it is requested that all craft keep a safe distance of at least 50m from the SeaGen pile whilst the crossbeam is raised. Vessel operators are respectfully requested to set an appropriate course at the earliest opportunity.

When the crossbeam is left up for any overnight period it will be flood lit with spotlights showing the extremity of the obstruction which protrudes 20m either side of the main pile.

The first 1.2MW SeaGen generator was installed in Strangford Narrows between Strangford and Portaferry in Northern Ireland in April 2008 and was connected to the grid later that year in July.

[mappress]

Offshore WIND staff, February 3, 2014; Image: marineturbines

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago