offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›CT Offshore to Install Cables at Borkum Riffgrund 1
Grid Connection

February 7, 2014 · about 12 years ago

CT Offshore to Install Cables at Borkum Riffgrund 1

CT Offshore A/S has entered German market by inking a deal with DONG Energy for the cable installation and burial of inter-array cables at Borkum Riffgrund 1 OWF. Located 37 km from the north-west coast of Germany, the 277MW wind farm consists of 77 wind turbines. The cable installation vessel SIA,

1 minutes read
  • LinkedIn
  • X
  • Email

CT Offshore A/S has entered German market by inking a deal with DONG Energy for the cable installation and burial of inter-array cables at Borkum Riffgrund 1 OWF.

Located 37 km from the north-west coast of Germany, the 277MW wind farm consists of 77 wind turbines.

The cable installation vessel SIA, together with MV NICO and MV SANDER 2, all owned by CT Offshore, will install a total of 43 cables, starting mid-June this year.

“With this newly awarded contract in hand CT Offshore once again proves that it has become an important player within the offshore wind industry,” says CT Offshore CEO, Frank Hansen.

The first power from Borkum Riffgrund 1 is expected this year, while commercial operation is scheduled for 2015.

Offshore WIND staff, February 7, 2014; Image: CTOFFSHORE

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

16 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

18 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

26 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

16 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

18 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

26 days ago