offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›RenewableUK Disappointed with Recent Offshore Wind Setbacks
News

February 19, 2014 · about 12 years ago

RenewableUK Disappointed with Recent Offshore Wind Setbacks

Dong Energy announced that the London Array Phase 2 is not proceeding, while Forewind stated that the capacity of Dogger Bank is being scaled back. Reacting to these announcements, RenewableUK’s Director of Offshore Renewables, Nick Medic, said: “The overall project pipeline for UK offshore wind is

2 minutes read
  • LinkedIn
  • X
  • Email

Dong Energy announced that the London Array Phase 2 is not proceeding, while Forewind stated that the capacity of Dogger Bank is being scaled back.

Reacting to these announcements, RenewableUK’s Director of Offshore Renewables, Nick Medic, said:

“The overall project pipeline for UK offshore wind is still healthy, although obviously it’s disappointing when projects don’t go ahead or are scaled back. We’re maintaining our global lead, with more capacity installed in UK waters than the rest of the world put together.

“We have 22 offshore wind farms up and running, 5 under construction, 7 with planning consent and 11 awaiting approval. We’ve already installed 3,653 megawatts (MW) of capacity – enough to power more than two and a half million homes. We have a further 16,500MW in the pipeline – that’s four and a half times as much capacity as we have now.

“What we’re seeing now is a leaner, fitter, trimmer offshore wind sector with more streamlined projects. The overall capacity of Dogger Bank has only been reduced by 20% (from 9 gigawatts to 7.2GW), and London Array by 24% (as Phase 2 to would have added close to 200MW).

“There are plenty of positive developments underway – only yesterday DONG Energy announced plans to install the next generation of turbines at Burbo Bank Extension Offshore Wind Farm off the North Wirral coast.

“These will be more powerful than those currently in operation in UK waters, with a capacity of 8MW each – sufficient to power 5,500 British household per year.

“This shows how the technology is advancing by leaps and bounds in the UK’s offshore wind sector.

“All this has been achieved despite the uncertainty caused by Electricity Market Reform and mixed messaging from some parts of Government on its support for the deployment of renewable energy”.

Press release, February 19, 2014

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago