offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›WindGuard & BIMAQ Win Prize for Thermographic Rotor Blade Measurement
News

March 18, 2014 · about 12 years ago

WindGuard & BIMAQ Win Prize for Thermographic Rotor Blade Measurement

At this year’s EWEA annual conference, Deutsche WindGuard & BIMAQ (Bremen Institute for Metrology, Automation and Quality Science) were awarded a prize for their poster on thermographic rotor blade measurement. Deutsche WindGuard already used the procedure in a number of onsite measurements for cust

2 minutes read
  • LinkedIn
  • X
  • Email

At this year’s EWEA annual conference, Deutsche WindGuard & BIMAQ (Bremen Institute for Metrology, Automation and Quality Science) were awarded a prize for their poster on thermographic rotor blade measurement.

Deutsche WindGuard already used the procedure in a number of onsite measurements for customers. The measurement process was refined in cooperation with BIMAQ. By using a high-speed, high-definition thermography camera, it is possible to measure and thereby visualize even the slightest difference in temperature on the surface of a rotor blade on an operating wind turbine.

Different flow regimes (laminar or turbulent) affect the performance of an airfoil, but also the heat transfer between the rotor blade surface and the air, making the blade area with laminar flow warmer. A premature laminar/turbulent transition can be an indication of damages, erosion or contamination, which can have a negative effect on the aerodynamic qualities of the blade. Furthermore, the effectiveness of aerodynamic add-ons on the blade can be assessed while the wind turbine is in operation.

The measurement procedure was displayed at the annual conference of the European Wind Energy Association in Barcelona last week and was received with great interest. The winning poster was one of the 6 chosen out of 300 participants, because of its high innovative capacity and market potential.

“The great advantage of using thermography is that it requires no preparation of the blades. All tests can be run from ground-level while the turbine is operating”, says Nicholas Balaresque, Managing Director of Deutsche WindGuard Engineering, “You do not need to call in an expensive working platform or use rope access. There is no need to stop the turbine, which would involve additional costs. With hub heights and rotor diameters getting higher and higher, measurement procedures like this become more and more important in the future.”

Press release, March 18, 2014; Image: WINDGUARD

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago
Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago