offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›40th AREVA Wind Turbine Installed at Global Tech I
News

April 14, 2014 · about 12 years ago

40th AREVA Wind Turbine Installed at Global Tech I

The construction of towers and nacelles in the North Sea wind farm Global Tech I is running in full gear: During the weekend the 40th AREVA Wind turbine has been installed. The two high performance vessels Brave Tern and Bold Tern of Fred. Olsen Windcarrier have been deployed since January and March

1 minutes read
  • LinkedIn
  • X
  • Email

The construction of towers and nacelles in the North Sea wind farm Global Tech I is running in full gear: During the weekend the 40th AREVA Wind turbine has been installed.

The two high performance vessels Brave Tern and Bold Tern of Fred. Olsen Windcarrier have been deployed since January and March of this year respectively. Since then, they installed a total of 35 turbines. The record performance so far was eight turbines during one week including ten hours transfer times to the wind farm. The transhipment of the components takes place at the offshore terminal ABC Peninsular docks of the logistics provider BLG in Bremerhaven. The processes are all running so smoothly that the loading of four towers and nacelles is done within a little more than one day.

Until now, 40 towers and nacelles and nine rotor stars have been successfully installed. According to the programme, the wind farm will be fully erected and operational this summer. When Global Tech I is connected via the BorWin beta converter station to the grid, the eighty 5 megawatt turbines of AREVA Wind will then start to supply environmentally-friendly power for the equivalent needs of 445,000 households.

Press Release, April 14, 2014; Image: globaltechone

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago
Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago