offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Iv-Consult Draws Gode Wind Converter Platforms Topsides
Grid Connection

April 23, 2014 · about 12 years ago

Iv-Consult Draws Gode Wind Converter Platforms Topsides

The Iv-Consult has begun making the workshop drawings of two topsides of converter platforms, each approximately 1250 tons, for the Gode Wind 1 and 2 offshore wind projects. This project is for Iemants Steel Constructions N.V. in Belgium. Gode Wind 1 and 2 are offshore wind farm projects located nor

1 minutes read
  • LinkedIn
  • X
  • Email

The Iv-Consult has begun making the workshop drawings of two topsides of converter platforms, each approximately 1250 tons, for the Gode Wind 1 and 2 offshore wind projects.

This project is for Iemants Steel Constructions N.V. in Belgium. Gode Wind 1 and 2 are offshore wind farm projects located northwest of Nordreney in the German sector of the North Sea. The projects are developed by Dong Energy.

The capacity of Gode Wind 1 will be 332 megawatts and Gode Wind 2 will have a capacity of 252 megawatts. The cable capacity is 900 megawatts HVDC (High Voltage Direct Current), suitable for connections to other wind farms. The connection to the mainland is guaranteed by TenneT.

The Gode 1 and 2 wind farms will be installed 45 kilometres off the German coast of the North Sea. The wind farms will supply approximately 600,000 German households with electricity in 2016, when they are expected to become fully operational.

Press Release, April 23, 2014; Image: iv-groep

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

16 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

19 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

26 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

16 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

19 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

26 days ago