offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›UK National Grid’s Executive Director to Address Grid Reliability and Resiliency
Grid Connection

April 23, 2014 · about 12 years ago

UK National Grid’s Executive Director to Address Grid Reliability and Resiliency

Nick Winser, president of ENTSO-E and Executive Director of National Grid will join panel of executive experts at DNV GL’s (formerly DNV KEMA) Utility of the Future Leadership Forum, to identify how utilities, regulators, and customers should prepare for the grid challenges ahead. The forum will be

2 minutes read
  • LinkedIn
  • X
  • Email

Nick Winser, president of ENTSO-E and Executive Director of National Grid will join panel of executive experts at DNV GL’s (formerly DNV KEMA) Utility of the Future Leadership Forum, to identify how utilities, regulators, and customers should prepare for the grid challenges ahead.

The forum will be held on June 2-4, 2014, at The Grand Hyatt Hotel in Washington D.C, and will address the visualization of a 21st century grid, including the impact of renewable integration and distributed energy resources (encompassing solar, wind, energy storage, and microgrids).

Participants at the forum will explore issues affecting the energy industry from policy to use, including evolving needs of consumers, the rise of renewables, reliability and security, and increasingly complex regulatory requirements. As with years past, the forum will draw leaders from across the energy spectrum who offer innovative ideas and strategies for a sustainable and profitable energy future.

“Grid reliability and resiliency are key factors in the proposals that ENTSO-E develops to ensure lasting security of electric supply,” said Nick Winser, president, ENTSO-E . “ The collaborative discussion of best practices surrounding these topics is vital to our success and I am pleased to join forces with the other executive panelists at this year’s forum.”

Winser is joined by Nicholas Abi-Samra, Executive Consultant, DNV GL; Terry Boston, CEO, PJM Interconnection; Gerry Cauley, president and CEO, NERC; Gordon van Welie, president and CEO, ISO New England, and Stephen Whitley, president and CEO, New York ISO.

Hugo van Nispen, Executive Vice President, Energy Advisory at DNV GL added: “The dynamics of our energy future are increasingly connected across the globe—more than ever before. Establishing an investment framework and taking the necessary steps to ensure resilience and reliability are critical activities toward securing that future. As the host of DNV GL’s Utility of the Future Leadership Forum, I’m excited to have Nick share the pan-European challenge and explore solutions that are relevant to all participants—no matter how or where you connect to the grid.”

Press release, April 23, 2014; Image: National Grid

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

19 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

26 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

19 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

26 days ago