offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Navitus Bay Application Accepted
News

May 8, 2014 · about 12 years ago

Navitus Bay Application Accepted

Planning Inspectorate has accepted application for the proposed Navitus Bay offshore wind farm which was submitted on 10 April 2014. Sir Michael Pitt, Chief Executive, Planning Inspectorate said. “After careful consideration we have decided on behalf of the Secretary of State that the application su

1 minutes read
  • LinkedIn
  • X
  • Email

Planning Inspectorate has accepted application for the proposed Navitus Bay offshore wind farm which was submitted on 10 April 2014.

Sir Michael Pitt, Chief Executive, Planning Inspectorate said. “After careful consideration we have decided on behalf of the Secretary of State that the application submitted by Navitus Bay Development Ltd met the required tests set out in the legislation to be accepted for examination”.

“The applicant must now decide when to publicise the fact that its application has been accepted to proceed to examination and announce when members of the public will be able to register with the Planning Inspectorate as an interested party in the application”.

The application is for development consent to construct and operate the proposed Navitus Bay Wind Park, which comprises up to 194 wind turbine generators and associated onshore and offshore infrastructure, with an installed capacity of up to 970 MW.

The Project would be located on the bed of the English Channel approximately 17.3 km off Scratchell’s Bay and 14.4 km from Durlston Head covering an area of 153 square kilometers.

Press Release, May 08, 2014; Image: navitusbaywindpark

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago
Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago