offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Sea Challenger Preparing for Westermost Rough
News

May 19, 2014 · about 12 years ago

Sea Challenger Preparing for Westermost Rough

On Saturday, 17 May 2014, A2SEA’s new purpose built installation vessel Sea Challenger arrived in the Port of Esbjerg. The vessel will now mobilise for its first project, DONG Energy’s Westermost Rough in the UK. Sea Challenger is a sister vessel to Sea Installer, which entered into A2SEA’s fleet in

1 minutes read
  • LinkedIn
  • X
  • Email

On Saturday, 17 May 2014, A2SEA’s new purpose built installation vessel Sea Challenger arrived in the Port of Esbjerg. The vessel will now mobilise for its first project, DONG Energy’s Westermost Rough in the UK.

Sea Challenger is a sister vessel to Sea Installer, which entered into A2SEA’s fleet in December 2012 and went directly to Gunfleet Sands Ext. to install two Siemens 6MW test turbines.

“Sea Challenger is a purpose built offshore installation vessel powered by the knowhow, A2SEA has gained as pioneers with 14 years of experience in the business,” said Jens Frederik Hansen, CEO in A2SEA. He added that SEA CHALLENGER has secured work until the end of 2015.

Sea Challenger will mobilise for Westermost Rough until Mid-June where she will start the installation of 35 Siemens 6MW turbines – the first time anywhere in the world that these turbines are used on a large scale.

The Westermost Rough OWF is expected to be fully commissioned in the first half of 2015.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago
Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago