offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Tower Adapter Arrives at LORC Nacelle Testing Site
News

May 30, 2014 · about 12 years ago

Tower Adapter Arrives at LORC Nacelle Testing Site

The 68-tonne base adapter for the LORC Nacelle Testing has arrived on site and the two misalignment couplings for the LORC Nacelle Testing facility have been produced and are being transported to the site as well. The base adapter is where a tower adaptor will be mounted during tests on LORC Nacelle

1 minutes read
  • LinkedIn
  • X
  • Email

The 68-tonne base adapter for the LORC Nacelle Testing has arrived on site and the two misalignment couplings for the LORC Nacelle Testing facility have been produced and are being transported to the site as well.

The base adapter is where a tower adaptor will be mounted during tests on LORC Nacelle Testing for testing of wind turbines with a power output of up to 10 MW.

The misalignment coupling of nominal 3.5 MNm is used for testing of turbines of up to 3.5 MW. The larger misalignment coupling with nominal value 8.6 MNm will be used for the testing of turbines with a power output of up to 10 MW.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago
Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago