offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Application for Offshore Wind Project off Texas Withdrawn
Business & Finance

June 2, 2014 · about 12 years ago

Application for Offshore Wind Project off Texas Withdrawn

Baryonyx Corporation has withdrawn its permit application from the United States Army Corps of Engineers for an 18 MW Gulf Offshore Wind (GOWind) project off the coast of South Padre Island, Texas. Audubon Texas, an organization for conservation of natural ecosystems, focusing on birds and other wil

1 minutes read
  • LinkedIn
  • X
  • Email

Baryonyx Corporation has withdrawn its permit application from the United States Army Corps of Engineers for an 18 MW Gulf Offshore Wind (GOWind) project off the coast of South Padre Island, Texas.

Audubon Texas, an organization for conservation of natural ecosystems, focusing on birds and other wildlife, stated that “millions of migratory birds that pass over south Texas each year caught a break” with the application withdrawal.

“An off-shore wind farm in this region would sandwich some of the most critical migratory and wintering shorebird, waterfowl, and colonial water bird habitat in the world between two wind farms, causing mortality, disturbance, and displacement to millions of birds, and destroying pristine and protected habitat with transmission infrastructure. These cumulative effects could have broad-reaching ecological impacts,” the organization said.

The GOWind project, which would have comprised three Siemens’ 6 MW wind turbines with lattice jacket foundations, would have ultimately led to building a large-scale commercial wind farm.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceEnvironmentWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago