offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›Consultation Start for Hornsea Zone Project Two
R&D

June 20, 2014 · about 12 years ago

Consultation Start for Hornsea Zone Project Two

The Preliminary Environmental Information (PEI) for Project Two in the Hornsea Zone was released on 18th June 2014 for a 42 day consultation period. As part of this second and final phase of consultation, SMart Wind has invited all members of the public to a series of informative consultation events

1 minutes read
  • LinkedIn
  • X
  • Email

The Preliminary Environmental Information (PEI) for Project Two in the Hornsea Zone was released on 18th June 2014 for a 42 day consultation period.

As part of this second and final phase of consultation, SMart Wind has invited all members of the public to a series of informative consultation events in North Lincolnshire.

Statutory and non-statutory stakeholders will receive the PEI by post prior to commencement of the Phase 2 Consultation Events. Information will also be made available for download from SMart Wind’s website and available for inspection throughout the consultation period at Immingham Library and the offices of East Lindsey District Council.

Project Two is the second project to be developed in the Hornsea Zone and has a maximum generation capacity of up to 1,800 MW. The offshore wind turbines for Project Two will be located in the centre of the Hornsea Zone to the north and west of Project One, covering an area of approximately 462km2. Up to 360 wind turbines could be installed as part of the design envelope being considered by Project Two with a maximum upper tip height of 272m.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

15 days ago