offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›CENTA Delivers 58 Tonnes Couplings for LORC Nacelle Testing Facility
R&D

July 1, 2014 · about 12 years ago

CENTA Delivers 58 Tonnes Couplings for LORC Nacelle Testing Facility

CENTA, a specialist for flexible couplings, delivered the 58 tonnes misalignment coupling for the LORC Nacelle Testing facility, where final installations and preparations for the commissioning tests are ongoing and on schedule. The huge coupling has a nominal torque of 8.6 MNm, which makes it the l

1 minutes read
  • LinkedIn
  • X
  • Email

CENTA, a specialist for flexible couplings, delivered the 58 tonnes misalignment coupling for the LORC Nacelle Testing facility, where final installations and preparations for the commissioning tests are ongoing and on schedule.

The huge coupling has a nominal torque of 8.6 MNm, which makes it the largest coupling ever produced by the German company over its 40-year long history.

The coupling was delivered in parts, which are now being assembled in the testing hall on site. The CENTA coupling includes an overload unit for the nacelle tester. One important challenge for designers behind this record large coupling was to prepare it for a transmission torque of 8.6 resp. 11 MNm in combination with an overload unit for a release torque of 12.5 MNm and a release tolerance of only ±10%.

When free of load, the LORC Nacelle Testing facility’s highly dynamic motor is capable of generating the full operating torque within milliseconds in order to provide an optimum simulation of real-world wind conditions. This kind of loads demands reliable couplings.

LORC has two misalignment couplings: one smaller coupling of nominal 3.5 MNm will be used for testing of turbines of up to ~4 MW, and the larger misalignment coupling with a nominal value of 8.6 MNm will be used for the testing of turbines with a power output of 8 – 10 MW.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

22 days ago

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

23 days ago

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

23 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

22 days ago
Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

23 days ago
New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

23 days ago