offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›VIDEO: Installation of Westermost Rough Offshore Substation
Operations & Maintenance

July 15, 2014 · about 12 years ago

VIDEO: Installation of Westermost Rough Offshore Substation

The substation for Westermost Rough was placed firmly on the jacket in the beginning of June, 2014 and it was a very smooth and a very fast process. Following the set-down, the welding of the topside to the jacket was performed, the lifting rigging removed and the stairs connecting the topside to th

1 minutes read
  • LinkedIn
  • X
  • Email

The substation for Westermost Rough was placed firmly on the jacket in the beginning of June, 2014 and it was a very smooth and a very fast process.

Following the set-down, the welding of the topside to the jacket was performed, the lifting rigging removed and the stairs connecting the topside to the boat landings lowered.

Check out the video below to see the timelapse of the offshore substation installation for Westermost Rough.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

14 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

14 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago