offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›ORE and Doble Team Up for HV Lab
News

July 24, 2014 · about 12 years ago

ORE and Doble Team Up for HV Lab

The Offshore Renewable Energy (ORE) Catapult’s UKAS accredited High Voltage Electrical Laboratory has taken delivery of a 640kV resonant transformer in collaboration with Doble Engineering. The new partnership gives the HV laboratory, based at the National Renewable Energy Centre in Blyth, an enhanc

3 minutes read
  • LinkedIn
  • X
  • Email

The Offshore Renewable Energy (ORE) Catapult’s UKAS accredited High Voltage Electrical Laboratory has taken delivery of a 640kV resonant transformer in collaboration with Doble Engineering.

The new partnership gives the HV laboratory, based at the National Renewable Energy Centre in Blyth, an enhanced capability enabling testing on bushings, high voltage power cables and other transmission system equipment up to 640kV levels. The combination of the HV laboratory testing and Doble’s field testing experience will provide the market with a unique and independently accredited testing and problem solving service.

The laboratory, which has a long track record of delivering type certification and development test support, performing failure investigations, life extension opportunity assessments and technology validation support relating to new technologies, was awarded accreditation by UKAS for the testing of power cable systems in 2013; complementing the lab’s existing ASTA/Intertek credentials. The arrival of the 640kV transformer enhances the existing 1MV DC voltage supply capability, and is a significant upgrade to the AC test capability in the laboratory. It allows power frequency (50Hz) AC withstand testing as part of the type test requirement on equipment for use on systems with operational voltage levels up to 400kV. The transformer will also be used to carry out insulation breakdown testing on HV power cables, such as partial discharge (PD), radio interference voltage (RIV) and tan delta tests.

With wave and tidal array power systems being developed and offshore oil, gas and offshore wind inter-array systems moving to ever higher operational voltages, these test services and skills will help to support the development and certification of the next generation of offshore transmission and distribution power systems.

Alex Neumann, Head of HV at the ORE Catapult commented: “Electrical infrastructure is a key area of focus for the ORE Catapult. The combined strength of this partnership will enable us to deliver a unique and much needed development platform to the market.

“With the demise of testing facilities of this nature in the UK over the past decades, it is refreshing that partnerships like this can be formed to make best use of existing infrastructure to deliver a quality assured, efficient and future-facing business opportunity. The interests of both organisations complement one another, which makes collaboration appealing from a technical as well as business perspective.”

Lee Morgan, Regional Sales Manager UK & Ireland, Doble Engineering, said: “Doble Engineering Co have been serving the electric power industry for almost a century, and pride themselves on being an independent source of knowledge and experience on such critical assets. Partnering with ORE Catapult, who share this stance, enables a vital technical gap to be plugged in the region of HV Testing.

“With the industry facing increasing cost challenges, it is of huge importance that utilities ensure they are making the most of existing assets, and that they have the confidence in taking decisions based on engineering expertise and knowledge to allow them into service and beyond.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago