offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Aquamarine Replaces Oyster Cylinder Module
Wind Farm Update

August 1, 2014 · about 12 years ago

Aquamarine Replaces Oyster Cylinder Module

Wave energy company Aquamarine Power has successfully replaced the cylinder module on their Oyster 800 wave machine as their comprehensive summer refit passes the half way mark. The 23 tonne module was refitted to the 800kW test machine – located at the European Marine Energy Centre in Orkney – in a

1 minutes read
  • LinkedIn
  • X
  • Email

Wave energy company Aquamarine Power has successfully replaced the cylinder module on their Oyster 800 wave machine as their comprehensive summer refit passes the half way mark.

The 23 tonne module was refitted to the 800kW test machine – located at the European Marine Energy Centre in Orkney – in an operation which took just over two days.

“This is an important waymark on our route to reliable electricity generation,” says company Chief Executive Officer Martin McAdam.

“This new module incorporates a number of significant upgrades to the one it replaces – including new check valves, hoses and control and instrumentation. We have worked closely with suppliers Hunger Hydraulik and Calder Engineering to make it robust enough to withstand the extreme forces it will experience during operation.

“The Oyster concept clearly works – it is the only wave machine to have operated continuously for three winters, and has generated multiple megawatt hours of electrical power. Oyster can withstand 100 per cent of all sea states, and the goal now is to generate electricity reliably. This is a challenge for the whole industry, and it is only through full-scale testing can we find out what works, what doesn’t and the evolutionary changes we need to make,” McAdam concludes.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

15 days ago