offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Regen SW: West Coast With no Round 3 Offshore Wind Project
News

August 1, 2014 · about 12 years ago

Regen SW: West Coast With no Round 3 Offshore Wind Project

The cancellation of the 4.2GW Celtic Array wind farm by the development partnership of Centrica and DONG, represents a “real blow” to the economy on the west coast of the UK, Northern Ireland and the Republic of Ireland, according to independent experts, Regen SW. The announcement comes just eight m

2 minutes read
  • LinkedIn
  • X
  • Email

The cancellation of the 4.2GW Celtic Array wind farm by the development partnership of Centrica and DONG, represents a “real blow” to the economy on the west coast of the UK, Northern Ireland and the Republic of Ireland, according to independent experts, Regen SW.

The announcement comes just eight months after the cancellation of RWE’s 1.2GW Atlantic Array project in the Bristol Channel and 4 months after SSE’s cancellation of the 0.7GW Islay Array; leaving the west coast with no Round 3 offshore wind projects and a dwindling Round 2 pipeline of just 2.6GW left to build, 30% of what it was a year ago.

These west coast regions have been investing in the work force and infrastructure to serve offshore wind for the past 10 years and now face a vacuum to the tune of 6.1GW of lost pipeline capacity and more than 10,000 future jobs. An example of this investment in infrastructure is Belfast Harbour’s purpose built offshore wind terminal, completed in February 2013 to build and service the future Irish Sea wind farms at a cost of £50m. The facility currently supports hundreds of jobs in the city.

Ian Godfrey, programme manager, Regen SW said “whilst the technical challenges of ground conditions at the Celtic Array and Atlantic Array locations have been cited as the reason for the demise of both projects, the root cause is arguably political.”

Ian continued “There is a big mismatch between the potential UK offshore wind pipeline of 37GW and the government’s target for 10 to 12GW by 2020. The recently announced Contract for Difference budget for offshore wind appears to reduce this ambition further. These disparities do not create the stable and appetising investment climate required by the industry.”

“With commitment to creating the right investment climate and an increased focus on research and development of foundation systems for complex ground conditions and deep water sites, the UK will continue to play a global leadership role in the sector, reaping the rewards of this position with economic growth both locally and through global exports.”

The planned trial of the PelaStar floating wind foundation at Wave Hub in 2015 is an example of how the south west of the UK is engaging in this research and development activity, creating intellectual property, reducing costs and opening up UK offshore wind resource by making deeper sites accessible.

The next ten years will be instrumental in determining whether the UK remains as a global leader in the offshore wind sector. With the right political support, the west coast of the UK has the resource and the expertise to contribute to and benefit from this leadership position.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago