offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Van Oord Kicks Off Eneco Luchterduinen Foundation Installation
Wind Farm Update

August 1, 2014 · about 12 years ago

Van Oord Kicks Off Eneco Luchterduinen Foundation Installation

Van Oord kicked off the construction works on a 129MW wind farm located in the Dutch area of the North Sea. Yesterday, the wind turbine construction jack-up vessel Aeolus commenced the foundation installation at Eneco Luchterduinen offshore wind farm. The wind energy project will comprise 43 Vestas

1 minutes read
  • LinkedIn
  • X
  • Email

Van Oord kicked off the construction works on a 129MW wind farm located in the Dutch area of the North Sea.

Yesterday, the wind turbine construction jack-up vessel Aeolus commenced the foundation installation at Eneco Luchterduinen offshore wind farm.

The wind energy project will comprise 43 Vestas V112 wind turbines installed 23 kilometers off the Dutch coast near Noordwijk and Zandvoort. It will be able to produce clean electricity for nearly 150,000 households.

Luchterduinen will feature new foundations where the monopile and the transition piece, which are usually built as two separate components, are built as a single component.

They were fabricated in the city of Roermond by Sif Group, a provider of steel structures for the offshore wind and oil & gas industry.

The wind farm, a joint operation between the Japanese company Mitsubishi Corporation and Eneco Group, is expected to be completed by the mid 2015.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

15 days ago