offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›Mainstream Starts Seabed Survey of Neart na Gaoithe OWF Site
R&D

August 11, 2014 · about 12 years ago

Mainstream Starts Seabed Survey of Neart na Gaoithe OWF Site

Mainstream Renewable Power has recently started its detailed geotechnical and geophysical survey of the proposed Neart na Gaoithe offshore wind farm site. The survey work commenced on August 4th 2014 and will continue until approximately September 30th 2014. The planned wind farm site is located in

1 minutes read
  • LinkedIn
  • X
  • Email

Mainstream Renewable Power has recently started its detailed geotechnical and geophysical survey of the proposed Neart na Gaoithe offshore wind farm site.

The survey work commenced on August 4th 2014 and will continue until approximately September 30th 2014. The planned wind farm site is located in the outer Forth Estuary approximately 15km to the east of Fife Ness and 30km to the north of Torness.

Up to three different specialist geotechnical vessels will collect soil and rock samples from each of the 75 potential turbine locations. A separate vessel will also undertake geophysical magnetometer and multi-beam surveys.

This represents Mainstream’s continuing commitment to the construction of this large infrastructure project and marks a significant stage in the projects as it enters the final design phase in preparation for a financial investment decision.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

15 days ago