offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›Suction Bucket Jacket Foundation Installed at Borkum Riffgrund 1 (Gallery)
R&D

August 28, 2014 · about 12 years ago

Suction Bucket Jacket Foundation Installed at Borkum Riffgrund 1 (Gallery)

DONG Energy has installed a suction bucket jacket foundation at its German offshore wind farm, Borkum Riffgrund 1. An innovative new foundation could help cut the costs of electricity from offshore wind farms. Now, it has been successfully deployed by DONG Energy as part of its collaboration with th

1 minutes read
  • LinkedIn
  • X
  • Email

DONG Energy has installed a suction bucket jacket foundation at its German offshore wind farm, Borkum Riffgrund 1.

An innovative new foundation could help cut the costs of electricity from offshore wind farms. Now, it has been successfully deployed by DONG Energy as part of its collaboration with the UK’s Carbon Trust Offshore Wind Accelerator (OWA).

The full-scale trial of the Suction Bucket Jacket foundation is being conducted at the Borkum Riffgrund 1 offshore wind farm, 37km off the North West coat of Germany, which is the culmination of work to overcome one of the key challenges that will be faced by offshore wind farms of the future.

Borkum Riffgrund 1 has been selected for testing the foundation due to its sandy seabed, which makes the installation a challenge and provides a more solid case for the evaluation of the concept.

Take a look at the photo gallery of the installation:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DTechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

15 days ago