offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Top News of the Week Sep 22 – 28, 2014
News

September 28, 2014 · about 12 years ago

Top News of the Week Sep 22 – 28, 2014

Suction Bucket Installation (VIDEO) Suitable for water depths of 30-60m with a height of 57m and weighing roughly 850 tonnes. The suction bucket jacket is installed at the offshore wind farm Borkum Riffgrund 1 in Germany. 2nd Generation Vessels: Hype or Hallelujah? (A2SEA Story) Often, new technolog

1 minutes read
  • LinkedIn
  • X
  • Email

Suction Bucket Installation (VIDEO)

Suitable for water depths of 30-60m with a height of 57m and weighing roughly 850 tonnes. The suction bucket jacket is installed at the offshore wind farm Borkum Riffgrund 1 in Germany.

2nd Generation Vessels: Hype or Hallelujah? (A2SEA Story)

Often, new technology doesn’t live up to expectations – and there have been plenty of expectations around second-generation vessels such as SEA INSTALLER. Has this much-awaited vessel delivered on its promises?

Siemens to Present New Technologies at WindEnergy

Ready for new markets: Under the banner slogan “Green Energy. Made in Hamburg”, Siemens Energy is presenting its newest products at the wind power trade fair “WindEnergy 2014″ in Hamburg, Germany from September 23 through 26.

Jan De Nul’s Tiger Protects Butendiek OWF Monopiles

Jan De Nul Group is in charge of the installation of scour protection for the 80 monopiles of the offshore wind farm Butendiek, located in the North Sea west of Sylt.

Alstom’s 6MW Haliade Offshore Wind Turbine Produces First kWh

On September 19th, Alstom’s next-generation Haliade™ 150-6MW offshore wind turbine, installed just off the Ostend coast at Belgium’s Belwind facility, produced its very first kWh.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago