offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›ULSTEIN to Design and Equip Van Oord’s New Subsea Rock Installation Vessel
Business & Finance

September 29, 2014 · about 12 years ago

ULSTEIN to Design and Equip Van Oord’s New Subsea Rock Installation Vessel

ULSTEIN has been awarded the design and equipment contract for Van Oord’s new subsea rock installation (SRI) vessel ‘Bravenes’. Working in close cooperation with Van Oord, this is the first fully integrated design where ULSTEIN is responsible for the development and integration of both the mission e

2 minutes read
  • LinkedIn
  • X
  • Email

ULSTEIN has been awarded the design and equipment contract for Van Oord’s new subsea rock installation (SRI) vessel ‘Bravenes’. Working in close cooperation with Van Oord, this is the first fully integrated design where ULSTEIN is responsible for the development and integration of both the mission equipment and vessel design.

The vessel will be constructed at Sinopacific Shipbuilding Group in China and is scheduled to be delivered in 2016.

The dynamically-positioned vessel is a unique, innovative design featuring a DP-3 system, the distinct ULSTEIN® X-BOW® hull line and meets the requirements for Clean Design Notation, Green Passport and Ice Class 1A – PC7. Furthermore the vessel and its equipment are designed for year-round operability in harsh weather and high-sea states.

Under the contract ULSTEIN will also supply the main Fall Pipe Deployment system and the majority of the ancillary systems of the SRI tower. ULSTEIN put a strong focus on simplicity, by mechanising the systems as much as possible, enabling higher levels of safety and control and as such minimising human interaction during the deployment and recovery of the fall pipe. The resulting system is robust and fully customised, able to efficiently switch between various rock installation modes and a wide range of rock sizes.

Arjan Boezeman, Director Sales and Concept Development at Ulstein Idea Equipment Solutions, said : “We started developing a new, innovative fall pipe deployment system in summer 2013 and proved its feasibility by testing a real scale model early this year. It has been engineered to provide best-in-class installation cycle times in water depths up to 600 m and beyond.”

His colleague Edwin van Leeuwen, General Manager at Ulstein Sea of Solutions , added: “With our extensive experiences in developing innovative equipment and vessel designs, we took a proactive approach towards Van Oord’s requirements. Together with their project team, we have been raising the bar to come to a more sustainable, safer and cost efficient SRI vessel.”

[mappress mapid=”14254″]

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

17 days ago

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

17 days ago
Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

18 days ago