offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Forewind Consults on Dogger Bank Changes
Grid Connection

October 14, 2014 · about 11 years ago

Forewind Consults on Dogger Bank Changes

Forewind has started a consultation on two minor proposed changes to the development consent order application for Dogger Bank Teesside A&B. Dogger Bank Teesside A&B comprises two 1.2 gigawatt wind farms located 165 kilometres from the UK coast at their closest point and is planned to connect to the

1 minutes read
  • LinkedIn
  • X
  • Email

Forewind has started a consultation on two minor proposed changes to the development consent order application for Dogger Bank Teesside A&B.

Dogger Bank Teesside A&B comprises two 1.2 gigawatt wind farms located 165 kilometres from the UK coast at their closest point and is planned to connect to the national grid at the existing Lackenby substation near Eston, in Redcar & Cleveland. The hearings for the examination of the application start today (Tuesday, October 14).

The first proposed change is to divert a short section of the cable route within Sembcorp’s Wilton International complex to avoid land in use by an existing tenant.

The second proposed change is in response to revisions made by York Potash Ltd to proposals for a new potash mine. Forewind has taken the opportunity to reduce the temporary working width of a 540m long section of the onshore cable route from 50m to 36m.

The documents detailing the proposed amendments can be found in the Downloads section of Forewind’s website, and can also be viewed at the Redcar Central, Markse and Saltburn libraries.

[mappress mapid=”14443″]

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago