offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Eneco Luchterduinen Export Cable Makes Beach Landing (Gallery)
Grid Connection

October 17, 2014 · about 11 years ago

Eneco Luchterduinen Export Cable Makes Beach Landing (Gallery)

With arrival of the export cable at the Dutch shore on Wednesday, the Luchterduinen offshore wind farm, located 23 kilometers off the coast of Noordwijk and Zandvoort, has reached another important realisation step. The cable will transport the energy of 43 wind turbines with a total capacity of 129

2 minutes read
  • LinkedIn
  • X
  • Email

With arrival of the export cable at the Dutch shore on Wednesday, the Luchterduinen offshore wind farm, located 23 kilometers off the coast of Noordwijk and Zandvoort, has reached another important realisation step.

The cable will transport the energy of 43 wind turbines with a total capacity of 129MW to shore. It will take the installation vessel NDurance about two weeks to install the cable from the shore to the high voltage substation at the wind farm. The cable will be buried by means of burial tool Trenchformer.

The next step will be to connect the export cable and the land cable in the beach pit near Noordwijk.

// Powered by Cincopa Video Hosting for Business solution. Eneco Luchterduinen Export Cable Makes Beach Landing cameramake SAMSUNG height 1200 orientation 1 camerasoftware FW Ver 1311062 originaldate 10/12/2014 8:30:09 PM width 1600 cameramodel WB800F height 3264 width 2448 orientation 1 originaldate 1/1/0001 6:00:00 AM height 1536 width 2048 originaldate 1/1/0001 6:00:00 AM cameramake Canon height 595 flash 16 camerasoftware Adobe Photoshop CS6 originaldate 10/12/2014 2:03:27 PM width 893 orientation 1 cameramodel Canon EOS 5D Mark II cameramake NIKON CORPORATION height 2608 camerasoftware Adobe Photoshop Came originaldate 10/15/2014 6:19:24 PM width 4090 cameramodel NIKON D3S height 960 width 704 originaldate 1/1/0001 6:00:00 AM height 717 width 960 originaldate 1/1/0001 6:00:00 AM

The land cable connection from the beach to the substation of TSO TenneT in Sassenheim has already been completed and successfully tested last month. The construction works at the beach are expected to be finished in November 2014, while the wind farm itself is expected to be operational by the end of 2015.

[mappress mapid=”14471″]

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

19 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

26 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

19 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

26 days ago