offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›Germany Allocates Connection Capacity to Eight Offshore Wind Farms
Authorities

October 28, 2014 · about 11 years ago

Germany Allocates Connection Capacity to Eight Offshore Wind Farms

In its first allocation of connection capacity process for wind farms at sea, the Federal Network Agency (BNA) has reviewed applications for capacity allocation process. Eleven applications from operators of wind farms at sea were submitted by October 1, 2014. Eight of them were approved. Three were

1 minutes read
  • LinkedIn
  • X
  • Email

In its first allocation of connection capacity process for wind farms at sea, the Federal Network Agency (BNA) has reviewed applications for capacity allocation process.

Eleven applications from operators of wind farms at sea were submitted by October 1, 2014. Eight of them were approved.

Three were rejected because the application was not complete or the wind farm is located in a cluster which has no free connection capacity within the current allocation process.

The following applications are authorized to participate in the allocation process: RIFFGAT for 5.4 MW, Trianel Windpark Borkum for 200 MW, Borkum Riffgrund 1 for 20.4 MW, Borkum Riffgrund 2 for 100.8 MW,OWP Albatros for 316 MW, EnBW Hohe See for 450 MW, Wikinger for 350 MW and Arkona Becken Südost for 385 MW.

[mappress mapid=”14575″]

Offshore WIND Staff; Image: alpha ventus (Illustration)

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesGrid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago