offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Baltic 2 TPs Built and on Their Way to Bladt Industries
Business & Finance

November 4, 2014 · about 11 years ago

Baltic 2 TPs Built and on Their Way to Bladt Industries

The order for AMBAU to manufacture 41 transition pieces (TPs) for Bladt Industries A/S to be used in the EnBW Baltic 2 wind farm came to an end on 16 October 2014 as the TPs were loaded for shipment. With a footprint of 13.5 metres, these TPs were the largest components ever to have left the facilit

1 minutes read
  • LinkedIn
  • X
  • Email

The order for AMBAU to manufacture 41 transition pieces (TPs) for Bladt Industries A/S to be used in the EnBW Baltic 2 wind farm came to an end on 16 October 2014 as the TPs were loaded for shipment.

With a footprint of 13.5 metres, these TPs were the largest components ever to have left the facilities at AMBAU Bremen – and they cannot come any bigger: nudging each one of these pieces out of the factory gates was a precision job in itself.

The connecting pieces between the jacket and tower will finally be put together into complete jacket constructions at Bladt Industries’ assembly hall in the Lindø Industrial Park.

The TPs will be used 32 kilometres north of the Isle of Rügen, where 80 wind turbines will be generating around 1.2 billion kilowatts of power annually after commissioning – enough to supply around 340,000 households with electricity.

[mappress mapid=”14655″]

Press release; Image: AMBAU

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago