On Monday, November 3, a rope access exercise was carried out at the Lincs offshore wind farm, situated 8km off the coast of Lincolnshire, near Skegness.
One of our readers provided Offshore WIND with photos from the exercise, which was done from the blades of the LS19 turbine down to the deck of the Cymyran Bay vessel.
Construction of the Lincs wind farm started in 2010 and it was fully commissioned last year. Lincs is a joint venture between Centrica Energy, DONG Energy and Siemens Project Ventures.
Check out the gallery:
// Powered by Cincopa Video Hosting for Business solution. New Gallery 2014/11/5 originaldate 1/1/0001 6:00:00 AM width 960 height 717 originaldate 1/1/0001 6:00:00 AM width 704 height 960 originaldate 1/1/0001 6:00:00 AM width 704 height 960 originaldate 1/1/0001 6:00:00 AM width 704 height 960 originaldate 1/1/0001 6:00:00 AM width 704 height 960