offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Wagenborg Supports German Energy Transition with Transformer Transport
Business & Finance

November 14, 2014 · about 11 years ago

Wagenborg Supports German Energy Transition with Transformer Transport

Due to German “Energiewende”, TenneT is preparing its transmission system to handle energy from offshore wind farms. As one of the major components, Wagenborg transported a transformer weighing 260 tonnes from Nürnberg to the substation in Diele last weekend. On November 3, the transformer was trans

2 minutes read
  • LinkedIn
  • X
  • Email

Due to German “Energiewende”, TenneT is preparing its transmission system to handle energy from offshore wind farms. As one of the major components, Wagenborg transported a transformer weighing 260 tonnes from Nürnberg to the substation in Diele last weekend.

On November 3, the transformer was transported from the manufacturer to Rotterdam by an inland water vessel. Upon arrival in Rotterdam, a floating crane took care of the transshipment of the transformer and lifted the heavy unit on a 18-axle modular trailer. Subsequently the trailer drove on a pontoon, after which the journey could continue to Bingum (Germany) over inland waters. On Saturday, November 8, the transformer was discharged by means of a RORO operation to be transported to the Diele substation the following day.

The entire project was planned and prepared properly, but some occasions cannot be foreseen… Due to heavy fog, an inland vessel collided with a bridge on the Eemskanaal near Groningen and temporarily blocked the transport route. The transport was jeopardized to get delayed.

However, on Sunday afternoon the transformer arrived at Bingum after which the load was transported to Diele within only 3,5 hours and installed upon foundation on Monday. For the road transport form the RORO quay to the substation, a 18-axle modular trailer was used. Upon arrival of the trailer at the transformer station in Diele, the load was driven under a 500-tons lifting gantry, which lifted the transformer off the trailer.

Finally the transformer was pulled to its final destination with hydraulic tirfors.

[mappress mapid=”14778″]

Press release; Image: Wagenborg

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceOperations & Maintenance

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

15 days ago