offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›TenneT Ready for Noordoostpolder Wind Farm Connection
Grid Connection

November 20, 2014 · about 11 years ago

TenneT Ready for Noordoostpolder Wind Farm Connection

The Dutch grid operator TenneT has completed the last technical tests for the cable connection of Noordoostpolder wind farms. The work on the connection system included the construction of a high voltage substation at Westermeerdijk, the construction of a 110kV cable line that goes from Westermeerdi

1 minutes read
  • LinkedIn
  • X
  • Email

The Dutch grid operator TenneT has completed the last technical tests for the cable connection of Noordoostpolder wind farms.

The work on the connection system included the construction of a high voltage substation at Westermeerdijk, the construction of a 110kV cable line that goes from Westermeerdijk via Emmeloord to Ens, adaptation of a high voltage substation Emmeloord Zuidervaart and a major expansion of a high voltage substation in Ens.

TenneT believes it will complete the work until the spring of 2015, with the commissioning of the wind farm expected to take place the following year.

With a total capacity of 370MW, it will be able to provide enough electricity for 400,000 homes.

Noordoostpolder wind project consists of three separate wind farms totaling 86 wind turbines on water and on land, i.e. Windpark Westermeerwind (144 MW), NOP Agrowind (195 MW) and RWE Essent (30 MW).

[mappress mapid=”14836″]

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionTechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

13 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago