offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Alstom Soon to Inaugurate Saint-Nazaire Plants
News

November 25, 2014 · about 11 years ago

Alstom Soon to Inaugurate Saint-Nazaire Plants

On 2 December, Alstom will inaugurate its plants in Saint-Nazaire, dedicated to assembling nacelles and producing generators for the Haliade™ 150-6MW offshore wind turbine. The plants, now in the phase of HEQ (High Environmental Quality) certification and design, are expected to be the first in Fran

1 minutes read
  • LinkedIn
  • X
  • Email

On 2 December, Alstom will inaugurate its plants in Saint-Nazaire, dedicated to assembling nacelles and producing generators for the Haliade™ 150-6MW offshore wind turbine.

The plants, now in the phase of HEQ (High Environmental Quality) certification and design, are expected to be the first in France to obtain the label guaranteeing optimal working conditions for employees, notably through actions on their visual environment and acoustic comfort.

Moreover, HEQ certification implies reducing the environmental impact of the buildings. The plants will also have a positive effect in terms of job creation, with around 300 people engaged in their operation.

The Haliade™ 150 – 6MW offshore wind turbine

The Saint-Nazaire plants were designed to reach a production capacity of 100 Haliade™ 150 – 6MW offshore wind turbines per year. Alstom has specifically developed this new generation turbine for a sea-based environment. Thanks to its rotor with a diameter of 150 metres, its nominal power can reach as high as 6MW, which corresponds to the power supply for about 5,000 households.

Production is slated to begin in 2015, to meet the requirements of the projects recently awarded to the Group: the installation of 240 turbines in France and 5 turbines off the coast of Block Island in the United States.

Press release; Image: alstom

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago