offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Environment›Pondera, Arcadis to Prepare EIA for Dutch Offshore Grid Connection
Environment

November 26, 2014 · about 11 years ago

Pondera, Arcadis to Prepare EIA for Dutch Offshore Grid Connection

Pondera Consult, together with Arcadis, has been asked by TenneT (TSO) to support the entire EIA process for the offshore grid connection of offshore wind farms located in the wind development area “Borssele”. The Ministry of Economic Affairs decided in 2014 that wind development area “Borssele” wou

1 minutes read
  • LinkedIn
  • X
  • Email

Pondera Consult, together with Arcadis, has been asked by TenneT (TSO) to support the entire EIA process for the offshore grid connection of offshore wind farms located in the wind development area “Borssele”.

The Ministry of Economic Affairs decided in 2014 that wind development area “Borssele” would be the first area to be developed with TenneT being responsible for the grid connection of offshore wind farms in the Dutch sector of the North Sea.

The EIA scope will cover two offshore substations, four 220kV export cables and the onshore grid connection. The preparation and submission of the required documents, such as the EIA, supporting documents and the permit application, will contribute towards the final decision making process. Additionally, Pondera Consult and Arcadis will provide strategic advice on the permitting process and stakeholder management services.

“A clever solution to connect a complete cluster of wind farms to the electricity grid is important for the Netherlands in order to bring down the costs of this renewable energy source”, according to Hans Rijntalder, Director of Pondera Consult , a part of Wind Minds. “We expect that our combined experience and knowledge of environmental regulations regarding offshore EIA’s will be of added value to TenneT in this process.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

EnvironmentGrid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

15 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

18 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

25 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

15 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

18 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

25 days ago