offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Ecofys Assesses Risk of Dutch Offshore Wind
Business & Finance

November 27, 2014 · about 11 years ago

Ecofys Assesses Risk of Dutch Offshore Wind

The Netherlands plan to increase their installed offshore wind capacity to 4,500 megawatts by 2023. With the related roll-out reaching round 3, one of the first tenders issued will be the 700 MW tender for the Borssele coast area. The Dutch grid operator TenneT has been designated to become the oper

1 minutes read
  • LinkedIn
  • X
  • Email

The Netherlands plan to increase their installed offshore wind capacity to 4,500 megawatts by 2023. With the related roll-out reaching round 3, one of the first tenders issued will be the 700 MW tender for the Borssele coast area.

The Dutch grid operator TenneT has been designated to become the operator of the offshore grid. TenneT will build both the connection cable to the onshore connector station and an offshore transformer station (“hub”), to which the wind farm turbines can be connected directly.

A potential risk of this new situation is that the hub is not yet ready when the turbines have been built or, vice versa, that only part of the wind farm is ready after completion of the hub. In a recent study commissioned by the Netherlands Wind Energy Association (NWEA), Ecofys has estimated the cost of such “stranded assets”.

In earlier studies, Ecofys also considered the cost and risk implications of the hub concept compared to the conventional radial connection case, where wind farms connect directly to an onshore connection station. Both studies conclude that the hub concept itself is not necessarily more cost effective than the traditional design and that strong interface management is required to assure that no additional cost arise from stranded assets.

Press release; Image: Ecofys

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceR&D

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

19 days ago

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

20 days ago

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

19 days ago
Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

20 days ago
New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

24 days ago