offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Bladt Upends First Gode Wind TPs
News

December 19, 2014 · about 11 years ago

Bladt Upends First Gode Wind TPs

The first transition pieces (TPs) for DONG Energy’s Gode Wind offshore wind farm are now lining up at the harbour at Bladt Industries’ facilities in Aalborg. Thirteen of the 97 transition pieces are being upended this week by Bladt’s team. The transition pieces, with a diameter of six meters and a h

1 minutes read
  • LinkedIn
  • X
  • Email

The first transition pieces (TPs) for DONG Energy’s Gode Wind offshore wind farm are now lining up at the harbour at Bladt Industries’ facilities in Aalborg.

Thirteen of the 97 transition pieces are being upended this week by Bladt’s team.

The transition pieces, with a diameter of six meters and a height of approximately 30 meters, will weigh well over 500 tonnes when completed.

Bladt Industries is fabricating the 97 transition pieces in Aalborg, while its subcontractor EEW is fabricating 97 monopiles in Rostock.

[mappress mapid=”14992″]

Press release; Image: Bladt Industries

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago