MPI Offshore has acquired wind turbine installation vessel (WTIV), Victoria Mathias, from RWE Innogy.
Built in 2011 the vessels is designed to transport, lift and install wind turbines and their foundations. Key features include a 1,000-tonne-capacity main crane, a maximum operating depth of 45 metres and the ability to jack with 4,350 tonnes of cargo on board.
