offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Energinet.dk Seeks Contractor for UXO Survey
Business & Finance

January 12, 2015 · about 11 years ago

Energinet.dk Seeks Contractor for UXO Survey

Energinet.dk has invited potential contractors to prequalify for an unexploded ordnance (UXO) survey to be carried out in 2015 at the Horns Rev 3 offshore wind farm site. The Danish transmission system operator (TSO) Energinet.dk is preparing the installation of a 33 km export cable from the planned

1 minutes read
  • LinkedIn
  • X
  • Email

Energinet.dk has invited potential contractors to prequalify for an unexploded ordnance (UXO) survey to be carried out in 2015 at the Horns Rev 3 offshore wind farm site.

The Danish transmission system operator (TSO) Energinet.dk is preparing the installation of a 33 km export cable from the planned offshore wind farm Horns Rev 3. The cable extends from the planned transformer station to the west coast of Jutland, Denmark.

The cable route traverses areas with varying risk of encountering UXO and it has thus been decided that a multi-purpose UXO survey shall be performed to meticulously investigate the installation corridor and quantify the UXO risk.

With respect to survey methodologies, the installation corridor can be divided into the following zones:

1. Offshore section with a sporadic risk of encountering British air-delivered sea mines, jettisoned aerial bombs, anchored sea mines that have lost the anchor and sunk, UXO from a target practice area.

2. Offshore section with the same risk as above plus the risk of encountering German aluminum ground mines presumed to be laid in a mine field crossed by the installation corridor.

3. Near shore section extending across a zone extending 1 nm from the coast where there is an elevated risk of encountering anti-invasion mines.

Offshore WIND Staff; Image: Energinet.dk

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceR&DWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago