offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›RWE to Apply for Galloper CfD
News

January 14, 2015 · about 11 years ago

RWE to Apply for Galloper CfD

German utility RWE Innogy is considering options to revive its Galloper offshore wind farm project that was scrapped in October after its project partner SSE decided to pull out. RWE is aiming to bid for the government subsidy contract for difference (CfD) scheme after qualifying in December. “We ar

1 minutes read
  • LinkedIn
  • X
  • Email

German utility RWE Innogy is considering options to revive its Galloper offshore wind farm project that was scrapped in October after its project partner SSE decided to pull out.

RWE is aiming to bid for the government subsidy contract for difference (CfD) scheme after qualifying in December.

“We are eligible to bid and it is our intention to bid for a CfD,” said Richard Sandford, head of offshore wind at RWE.

Initially, the project was planned to be subsidized under the renewables obligation certificate (ROC) scheme. However, due to uncertainty over gaining the support, the German company halted the project.

Furthermore, Galloper is still eligible for ROC scheme, after Ofgem extended scheme’s grace period, which will be used as a backup in case of failing to win CfD.

“We are going to bid, we are going to bid a good price, and then we will have to see what happens. If we do not get a CfD then we will go down the ROC route,” Sandford added.

In addition, Sandford announced they will upgrade the initial 3.6 MW turbine model, thus reducing the total number of turbines in the project.

RWE will also look to reduce its stake in the project from 50% to 25% while SSE still aims to sell its entire 50 % portion.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago