offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Bladt Loads Out Last Baltic 2 Jacket Foundation
News

January 21, 2015 · about 11 years ago

Bladt Loads Out Last Baltic 2 Jacket Foundation

Bladt Industries loaded out the last of 41 jacket foundations for EnBW Baltic 2 offshore wind farm yesterday. After receiving the order, Bladt established a production site at Lindø Industrial Park where they created dedicated production line for serial production of jacket foundations. The first ja

1 minutes read
  • LinkedIn
  • X
  • Email

Bladt Industries loaded out the last of 41 jacket foundations for EnBW Baltic 2 offshore wind farm yesterday.

After receiving the order, Bladt established a production site at Lindø Industrial Park where they created dedicated production line for serial production of jacket foundations.

The first jacket was manufactured in May last year, after which it took the company around eight months to complete the order.

Located around 32 kilometers north of Ruegen Island in the German Baltic Sea the wind farm consists of 80 wind turbines of 3.6 MW each.

Due to soil conditions and water depths, 41 turbines will be installed on tripod jackets while 39 wind turbines will use monopile foundations.

After it is completed, the 288MW wind farm will produce enough electricity to power around 340.000 households.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago