offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›Australia: Final CETO 5 Wave Energy Device Preparing for Installation
Technology

January 27, 2015 · about 11 years ago

Australia: Final CETO 5 Wave Energy Device Preparing for Installation

Along with the news about the successful installation of its second CETO 5 wave energy unit off the coast of Perth, Western Australia, Carnegie Wave Energy has also announced that the third and final CETO 5 unit has been moved to the Australian Maritime Complex (AMC) in Henderson for final fit out a

2 minutes read
  • LinkedIn
  • X
  • Email

Along with the news about the successful installation of its second CETO 5 wave energy unit off the coast of Perth, Western Australia, Carnegie Wave Energy has also announced that the third and final CETO 5 unit has been moved to the Australian Maritime Complex (AMC) in Henderson for final fit out ahead of its installation.

The AMC is a world class marine industrial facility and will also be the likely staging point for Carnegie’s CETO 6 Project.

Current plans have Unit 3 deployment taking place after an initial Unit 2 run of some 30 days or so, subject to suitable weather conditions, and timed to coincide with the retrieval of the first CETO 5 Unit for onshore inspection.

Amongst other objectives, the 3rd CETO 5 Unit will be used to demonstrate operation and maintenance methodologies and, as such, may be held onshore for longer than 30 days to minimise installation and retrieval costs should Unit 1 continue to operate without needing to be retrieved onshore.

The first CETO 5 unit has now been operating for over 1700 hours, and has experienced a range of sea states, including waves up to 3.8m in height.

More than $30m has been invested in the design, development and construction of the Perth Wave Energy Project. The CETO technology takes an approach to wave power by generating both power and water from the ocean swell, while remaining fully submerged beneath the ocean surface, increasing its ability to survive large storms.

Image: Carnegie Wave Energy

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

24 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

24 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago