offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Dong Schedules Horns Rev 2 Blades Makeover
Operations & Maintenance

January 28, 2015 · about 11 years ago

Dong Schedules Horns Rev 2 Blades Makeover

Danish energy company, Dong Energy, will upgrade all turbines on 91 2.3MW turbines installed at Horns Rev 2 offshore wind farm. The company named larger than expected wear, caused by strong wind mixed with water, sand and salt, on seven-year-old blades as the reason for the refit job. Total of 273 b

1 minutes read
  • LinkedIn
  • X
  • Email

Danish energy company, Dong Energy, will upgrade all turbines on 91 2.3MW turbines installed at Horns Rev 2 offshore wind farm.

The company named larger than expected wear, caused by strong wind mixed with water, sand and salt, on seven-year-old blades as the reason for the refit job.

Total of 273 blades will be inspected, repaired with Siemens’ rubber coating and upgraded with new aerodynamic components increasing the power production by between 1% and 1.5%.

The new upgrade will improve wind capture equivalent to two additional 2.3 MW wind turbines, the company stated.

All refit work will be carried out in Esbjerg and will start May 2015 and is expected to finish in mid-summer 2016.

The wind farm, located in the North Sea 30km off the coast of western Jutland, was inaugurated in September 2009.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago