offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Trianel Generates Electricity at Borkum West
Grid Connection

February 3, 2015 · about 11 years ago

Trianel Generates Electricity at Borkum West

Trianel has produced first power from its 200MW Borkum West offshore wind farm located in the North Sea. The first turbine was commissioned on Sunday and is now undergoing trial operation. “After the permanent power connection was successfully established by the substation DolWin Alpha in December,

1 minutes read
  • LinkedIn
  • X
  • Email

Trianel has produced first power from its 200MW Borkum West offshore wind farm located in the North Sea.

The first turbine was commissioned on Sunday and is now undergoing trial operation.

“After the permanent power connection was successfully established by the substation DolWin Alpha in December, the first plant is now in trial operation,” said Klaus Horstick, Trianel managing director.

Comprising 40 Areva M5000 turbines, the wind farm is located 45 kilometers offshore Borkum island.

The wind turbine construction was completed in June last year, however, due to problems with transformer platform the wind farm was connected to the grid via the 800MW DolWin Alpha hub in December.

“We hope for favourable weather conditions to finish commissioning soon and to start commercial operation in the summer,” Horstick concluded.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago