offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Vattenfall Requires Painting Work at DanTysk
Business & Finance

February 3, 2015 · about 11 years ago

Vattenfall Requires Painting Work at DanTysk

Vattenfall is looking for a contractor who will carry out paint repair works on transition pieces (TPs) of DanTysk offshore wind turbines. The work includes surface preparation and painting of all the damaged areas on each of the foundation structures (TPs). Also, the contractor shall deliver the re

1 minutes read
  • LinkedIn
  • X
  • Email

Vattenfall is looking for a contractor who will carry out paint repair works on transition pieces (TPs) of DanTysk offshore wind turbines.

The work includes surface preparation and painting of all the damaged areas on each of the foundation structures (TPs). Also, the contractor shall deliver the required consumables, paint, sandpaper etc.

“It is essential that the paint repair work is carried out in accordance with Application Repair Procedure Smoulders for DanTysk Offshore Wind Farm and, NORSOK M 501 as well as the guidelines described in the paints technical data sheet. Personnel must be qualified for carrying out the task fulfilling the technical specifications and ER corrosion protection Oct 2013 of paint damage repairs in/on transition pieces in an offshore environment,” the company said.

The DanTysk offshore wind farm, located some 70 kilometers west of the island of Sylt in the German North Sea, comprises 80 Siemens’ 3.6 MW wind turbines.

Offshore WIND Staff; Image: Siemens

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceOperations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

13 days ago