offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›OMM Wraps Up at Butendiek
Grid Connection

February 9, 2015 · about 11 years ago

OMM Wraps Up at Butendiek

Offshore Marine Management (OMM) has completed a Project Support Package for the Butendiek Offshore Wind Farm. The wind farm, situated 32km west of the island of Sylt on the German/Danish border, comprises 80 wind turbines with a total capacity of 288 MW – enough to power 360,000 households. The wor

2 minutes read
  • LinkedIn
  • X
  • Email

Offshore Marine Management (OMM) has completed a Project Support Package for the Butendiek Offshore Wind Farm.

The wind farm, situated 32km west of the island of Sylt on the German/Danish border, comprises 80 wind turbines with a total capacity of 288 MW – enough to power 360,000 households.

The work involved connecting the Butendiek offshore wind farm to the Sylwin Alpha Convertor platform and saw OMM working for multiple key players within the industry to ensure separate phases of the project were completed efficiently.

The phases, which formed part of OMM’s project support package, included multiple Pre-Lay Grapnel Runs and Route Clearances throughout 2014, which were completed within the planned timescales.

Other phases saw pull-in operations, crew transfers by CTV as well as accommodation provision for both Offshore Marine Management staff and client personnel. Five guard vessels were also supplied by OMM during cable installation work.

Paul Hampton, Operations Manager at OMM, said: “Our flexibility enables us to deliver multiple services to multiple clients simultaneously, whilst maintaining the highest standards of quality and health and safety.”

“Our philosophy for the completion of the separate phases of the Butendiek project was the continuity of the experienced onshore and offshore personnel, as well as a commonality in the equipment provided and the utilisation of project specific procedures and processes. This philosophy is built around a core methodology developed and proven over years of successful operation in this sector and has ensured a high quality and, most importantly, safe service is offered to all our offshore partners.”

OMM played an integral part in ensuring that Sylwin Alpha was brought closer to capacity. The final Butendiek project was completed on 30th January 2015.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago