offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›New Foundation Installation System Developed
Business & Finance

March 6, 2015 · about 11 years ago

New Foundation Installation System Developed

Conquest Offshore, together with deugro Denmark A/S, has developed a highly efficient installation system for monopiles and transition pieces, supported by the engineering knowledge and experience of Temporary Works Design (TWD) and Barge Master. Parties have combined their experience and in depth k

1 minutes read
  • LinkedIn
  • X
  • Email

Conquest Offshore, together with deugro Denmark A/S, has developed a highly efficient installation system for monopiles and transition pieces, supported by the engineering knowledge and experience of Temporary Works Design (TWD) and Barge Master.

Parties have combined their experience and in depth knowledge of floating installation, offshore skidding, upending, pile handling and motion compensated tools and came up with a revolutionary new concept.

A newly designed and time effective skidding system makes a full deck load on the 136 meter barge possible. The ability to upend monopiles (from deck and floating) and the use of a specially designed motion compensated pile gripper provide the means for floating installation.

During hammering hydraulic cylinders actively compensate the motions of the barge to ensure the right inclination of the pile.

Conventionally, monopiles are installed by jack-up units with higher day rates and less deck space than floating barges. By taking advantage of the large deck space on the barge we can reduce the time and costs needed for transportation of monopiles and transition pieces and use the barge as floating storage – which altogether means that efficient floating installation has a much more competitive day rate.

On top of this, the floating installation concept is completely independent of the soil conditions and water depth.

Image: Conquest Offshore

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

18 days ago

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

18 days ago
Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

19 days ago