offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Bladt Loads Out First Gode Wind TPs
Business & Finance

March 23, 2015 · about 11 years ago

Bladt Loads Out First Gode Wind TPs

At 04.40 on Saturday morning, the first load-out of four anode cages and transition pieces (TPs) for Gode Wind Offshore Wind Farm was finished in record time of approximately 16 hours. This made Friday night full of heavy activity at Bladt’s site in Aalborg. Before its arrival in Aalborg, the STRALS

1 minutes read
  • LinkedIn
  • X
  • Email

At 04.40 on Saturday morning, the first load-out of four anode cages and transition pieces (TPs) for Gode Wind Offshore Wind Farm was finished in record time of approximately 16 hours.

This made Friday night full of heavy activity at Bladt’s site in Aalborg.

Before its arrival in Aalborg, the STRALSUND barge had visited Rostock in order to pick up the four monopiles for the transition pieces.

The transition pieces have a diameter of six meters and a height of approximately 30 meters.

Bladt Industries is fabricating the 97 Gode Wind transition pieces in Aalborg, while its subcontractor EEW is fabricating 97 monopiles in Rostock.

Image: Bladt

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

10 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

10 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago