offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Switch Receives Order from Atlantis
News

April 9, 2015 · about 11 years ago

Switch Receives Order from Atlantis

The Switch received an order to deliver a medium-speed generator for use in the Atlantis Resources Ltd AR1500 turbine drive train. During March 2015, Atlantis confirmed an order with The Switch for an integrated PM medium-speed generator that resulted from a successfully completed pre-design project

2 minutes read
  • LinkedIn
  • X
  • Email

The Switch received an order to deliver a medium-speed generator for use in the Atlantis Resources Ltd AR1500 turbine drive train.

During March 2015, Atlantis confirmed an order with The Switch for an integrated PM medium-speed generator that resulted from a successfully completed pre-design project carried out in 2014. The Switch generator will be used in its newest AR1500 turbine, which will be one of the world’s highest yield tidal generation devices. It is designed to withstand the extreme environmental conditions expected in Scotland and Canada. The turbine is scheduled for delivery to the MeyGen project in Q1 2016.

“By integrating the generator and gearbox as a pre-tested module, we are reducing assembly risk, reducing cost and improving reliability through the reduction in the number of bearings and assembly stages required prior to full commissioning of the nacelle,” says Drew Blaxland , ARL Chief Technology Officer.

The AR1500 is an active pitch, full yaw, horizontal axis tidal turbine with a rated power output of 1.5 megawatts achieved at flow rates of three meters per second. The design intent is to deliver the lowest cost of energy through military specification reliability and intelligent simplicity.

MeyGen, the company leading the project and largely owned by Atlantis, plans to deliver a fully operational renewable energy plant powered purely by the tide, starting with 6 MW in Phase 1a in 2016, and growing to almost 400 MW. This amount is the equivalent of generating electricity to power 400,000 Scottish homes.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago
Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago