offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›Gamesa Begins G132-5.0 MW Assembly
Technology

April 13, 2015 · about 11 years ago

Gamesa Begins G132-5.0 MW Assembly

Gamesa has begun the task of assembling its prototype G132-5.0 MW turbine, which will be equipped with one of the world’s largest onshore rotors. To this end it has replaced the blades of the G128-5.0 MW, which has been in operation at the R&D facility in Alaiz (Navarre, Spain) for a year, with thos

2 minutes read
  • LinkedIn
  • X
  • Email

Gamesa has begun the task of assembling its prototype G132-5.0 MW turbine, which will be equipped with one of the world’s largest onshore rotors.

To this end it has replaced the blades of the G128-5.0 MW, which has been in operation at the R&D facility in Alaiz (Navarre, Spain) for a year, with those of the G132-5.0 MW, with a view to enabling the turbine to begin to produce energy from the beginning of May.

This assembly job constitutes a logistical challenge for Gamesa: the blades of the G132-5.0 MW, each 64.5 metres in length, are the longest ever transported in Spain and were brought in a single piece from the factory in Aoiz, where they were made, to the R&D facility in Alaiz. The complexity of the transfer required the individual transportation of each blade.

Completion of the assembly work will kick-start the turbine validation and testing process with a view to obtaining type certification by the end of 2015, a prerequisite for industrialising and commercialising this model.

To this end, in addition to the prototype’s three blades, the company has made a fourth blade for testing at CENER, Spain’s national renewable energy centre. The static tests have already been completed and the fatigue tests (vertical and horizontal movements) are underway; these tests will take 5 months. All of these tests will also help to certify the blade to be installed in the G132-5.0 MW offshore model.

The prototype G132-5.0 MW, with a rotor diameter of 132 metres and a total height of 186 metres, generates 3% more power than the G128-5.0 MW and is capable of generating enough energy to supply 5,000 households for one year.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

24 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

24 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago