offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Forewind Goes Deep into Dogger Bank
Wind Farm Update

April 30, 2015 · about 11 years ago

Forewind Goes Deep into Dogger Bank

Through the undertaken surveys as part of its environmental impact assessment process, Forewind has extended the depth of knowledge about the geology of Dogger Bank. Geological maps used prior to Forewind’s work in the area were based on sparse data, gathered tens of kilometres apart in the late 196

2 minutes read
  • LinkedIn
  • X
  • Email

Through the undertaken surveys as part of its environmental impact assessment process, Forewind has extended the depth of knowledge about the geology of Dogger Bank.

Geological maps used prior to Forewind’s work in the area were based on sparse data, gathered tens of kilometres apart in the late 1960s and 1970s.

But since a far greater resolution was required to identify sites for the Dogger Bank wind farms, Forewind spent four years accumulating a huge amount of information via detailed geophysical surveys, seabed sampling and video traverses, geotechnical testing and other surveys.

Through the work it has been understood that the Dogger Bank has a complex geology, both vertically and laterally, as a result of the many different environments that have helped form it over more than 100,000 years. Ice has been key to the development of Dogger Bank, which was once above sea level and with an environment that could be compared to the current tundra conditions in Canada and Russia.

Work will continue on analysis of the data, differentiation of the formations and mapping zones of defined thrusting and faulting, and the area will be subject of a number of PhD thesis.

The operators that will progress the offshore projects on Dogger Bank post-consent will add to the body of data through the further surveys that will be required to create more detailed plans prior to the construction of the wind farms.

More details of the work undertaken by Forewind can be found here .

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago