offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›VIDEO: Installation of 6MW Wind Turbine at Westermost Rough
Wind Farm Update

May 6, 2015 · about 11 years ago

VIDEO: Installation of 6MW Wind Turbine at Westermost Rough

A2SEA’s specialist jack-up vessel Sea Challenger has recently installed the last 6MW turbine at Westermost Rough. Developed by Dong Energy the wind farm, comprising 35 turbines, can produce enough power to cover the annual electricity consumption of more than 150,000 households. The wind turbines ha

1 minutes read
  • LinkedIn
  • X
  • Email

A2SEA’s specialist jack-up vessel Sea Challenger has recently installed the last 6MW turbine at Westermost Rough.

Developed by Dong Energy the wind farm, comprising 35 turbines, can produce enough power to cover the annual electricity consumption of more than 150,000 households.

The wind turbines have three blades of 75 metres each and a total height of 177 metres. The three blades have a total blade span of 18,600 m2. All the wind turbines have produced the first power, but they still have to complete the final tests before we can officially declare the wind farm fully operational.

Westermost Rough has been constructed by DONG Energy, but it is owned by a joint venture between DONG Energy (50%) and the partners Marubeni Corporation (25%) and the UK Green Investment Bank (25%).

Watch the 1,46 minutes long time-lapse video of how we installed the wind turbines at Westermost Rough.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago