offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›CG Wins Veja Mate Substation Deal
Grid Connection

May 18, 2015 · about 11 years ago

CG Wins Veja Mate Substation Deal

Avantha Group Company CG, along with other consortium partners Cofely Fabricom and lemants, has been awarded the contract for the supply and installation of HV offshore substation for the 400 MW Veja Mate Offshore Project GmbH. The scope of work for CG includes the electrical engineering, grid compl

2 minutes read
  • LinkedIn
  • X
  • Email

Avantha Group Company CG, along with other consortium partners Cofely Fabricom and lemants, has been awarded the contract for the supply and installation of HV offshore substation for the 400 MW Veja Mate Offshore Project GmbH.

The scope of work for CG includes the electrical engineering, grid compliance studies, HV/MV equipment supply, installation and commissioning. The equipment will be installed at the 400 MW offshore substation for the Veja Mate wind farm located over 100 kilometers off the German coast in the North Sea. The project will be brought online before the end of 2017.

The 400 MW Veja Mate wind farm comprises of 67 wind turbines (6MW) and will be connected to the German high voltage grid via the BorWin2 converter platform. Veja Mate will produce enough electricity for over 280,000 households and reduce CO2 emissions by over 570,000 tons per year.

This project adds to the growing list of 12 offshore substations utilising CG high voltage AC (alternating current) solutions, with a total offshore wind generation capacity of nearly 3500 MW power. The accumulated contract value on these offshore wind high voltage transmission scope projects, including Veja Mate represents, approximately 200 Million Euro.

Offshore wind is a major component of Europe’s target to harness 20 percent of its energy from renewable sources. Currently, 12 projects are under progress and once completed, they will increase the installed capacity by around 3 GW, bringing the cumulative capacity in Europe to nearly 11 GW (Source: EWEA 2014 report).

Avantha Group Company CG’s CEO and Managing Director Laurent Demortier said: “We are delighted that our experienced and dedicated offshore team has been selected by Veja Mate for their offshore wind farm. The project is in line with our renewable energy strategy. It provides yet another opportunity to utilise CG’s unique technology and expertise in wind offshore connection (HVAC) and to assist the German Government in further reducing carbon emissions and increasing the supply of green energy”.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

20 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

27 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

20 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

27 days ago